Fast delivery within 72 Hours
Wago 2759-2015/261-1000
The “Application Grid Gateway” supports power distribution grid operators in assessing grid performance. This application allows grid operators to use their existing distribution grid more efficiently…
Request for Quote
Shipping & Delivery
-
Courier delivery
Our courier will deliver to the specified address
5-6 Days
From €20
-
DHL Courier delivery
DHL courier will deliver to the specified address
2-3 Days
From €40
-
Warranty 1 year
-
Free 30-Day returns
Description
The “Application Grid Gateway” supports power distribution grid operators in assessing grid performance. This application allows grid operators to use their existing distribution grid more efficiently, while avoiding unnecessary grid expansion. The measurement technology required in the substation for both the transformer and low-voltage outputs can be easily retrofitted. The measurement values of the medium voltage, transformer, low-voltage outputs, valve positions and temperatures are transmitted to the grid control system via IEC 60870-5-104. Commands and setpoints can also be received and processed. External measurement systems such as short-circuit/ground-fault direction indicators can be easily parametrized via Modbus RTU. The entire parameterization can be stored in a clear manner and, if necessary, added to other stations. The option of simulating measured data makes it possible to commission new substations at the station builder’s location from the grid control system without the field side being connected.All data, for example the measured values from the low-voltage outputs, can be communicated via MQTT to a cloud.Asset managers can more accurately plan substation maintenance cycles by accessing both stored data and digital drag indicators. In the event of maintenance or grid errors, remote access helps prepare grid managers for the on-site conditions. Remote updates for software modules and extensions are possible, eliminating unnecessary in-the-field service.Upon request, WAGO will provide you a hardware solution tailored to your customers’ substations.Patch and device management is available for the administration of a large number of distributed telecontrol devices with the WAGO Application Grid Gateway. This enables application updates, configuration changes, security patches and firmware upgrades, among other things. Technical Data:Number of LV outlets: up to 17 NS outletsFirmware: Hardening in compliance with BDEW White PaperPatch/device management: Application updates, configuration changes, security patches and firmware upgradesCommunication to the grid control system: IEC 60870-5-104Communication to the office network: HTTPS, MQTTMemory requirement on the SD card: less than 2 MB measurement data per day for 15 LV outletsAuthentication: local, LDAPUser groups: network management, network installer, network planner, asset manager, administratorNetwork interfaces: secure separation between SCADA and office network Compatible Controllers:750-8210; PFC200; G2; 4ETH750-8210/025-000; PFC200; G2; 4ETH; T750-8210/040-000; PFC200; G2; 4ETH; XTR750-8211; PFC200; G2; 2ETH 2SFP750-8211/040-000; PFC200; G2; 2ETH 2SFP; XTR750-8212; PFC200; G2; 2ETH RS750-8212/025-001; PFC200; G2; 2ETH RS; TELE; T750-8212/025-002; PFC200; G2; 2ETH RS; TELE; T; ECO750-8212/040-000; PFC200; G2; 2ETH RS; XTR750-8212/040-001; PFC200; G2; 2ETH RS; Tele; XTR750-8212/040-010; PFC200; G2; 2ETH M12; RS; XTR750-8217; PFC200; G2; 2ETH RS; 4G750-8217/025-000; PFC200; G2; 2ETH RS; 4G; T
Specification
Software data
| Supported devices | 750-8210: PFC200; G2; 4ETH RS, 750-8210/025-000: PFC200; G2; 4ETH RS; T, 750-8210/040-000: PFC200; G2; 4ETH RS; XTR, 750-8211: PFC200; G2; 2ETH 2SFP, 750-8211/040-000: PFC200; G2; 2ETH 2SFP; XTR, 750-8212: PFC200; G2; 2ETH RS, 750-8212/025-001: PFC200; G2; 2ETH RS; Tele; T, 750-8212/025-002: PFC200; G2; 2ETH RS; Tele; T; ECO, 750-8212/040-000; PFC200; G2; 2ETH RS; XTR, 750-8212/040-001; PFC200; G2; 2ETH RS; Tele; XTR, 750-8212/040-010: PFC200; G2; 2ETH M12; RS; XTR, 750-8217: PFC200; G2; LTE 2ETH RS, 750-8217/025-000: PFC200; G2; LTE 2ETH RS; T |
|---|
Delivery
| Delivery type | License certificate by email (software available for download) |
|---|---|
| License type (note) | The single license allows installation on one controller. One license per controller is required. |
| License type (note) (2) | A PC with both Internet connection and e!COCKPIT may be required for license activation. |
| License generation | DRM |
Commercial data
| PU (SPU) | 1 pcs |
|---|---|
| Packaging type | not specified |
| Country of origin | QU |
| GTIN | 4055143969444 |
| Customs tariff number | 88888888888 |
Product Classification
| ETIM 10.0 | EC002537 |
|---|---|
| UNSPSC | 43,232,402 |
| ETIM 9.0 | EC002537 |
| ECCN | NO US CLASSIFICATION |
Environmental Product Compliance
| RoHS Compliance Status | Compliant,No Exemption |
|---|

Reviews
Clear filtersThere are no reviews yet.