Fast delivery within 72 Hours

Sick Commissioning RFU/RFH

Engineering and integration | Installation and commissioning | Commissioning RFU/RFH | Product area: RFID | Range of services: Inspection of connection, alignment, optimization of parameters of the RF…

Request for Quote

Shipping & Delivery

  • Courier delivery

Our courier will deliver to the specified address

5-6 Days

From €20

  • DHL Courier delivery

DHL courier will deliver to the specified address

2-3 Days

From €40

  • Warranty 1 year
  • Free 30-Day returns

Description

Engineering and integration | Installation and commissioning | Commissioning RFU/RFH | Product area: RFID | Range of services: Inspection of connection, alignment, optimization of parameters of the RFU/RFH as well as testsSetup of previously defined functions of reading configuration, data processing and network, interfaces and inputs and outputs | Documentation: Archiving of product parameters in a SICK databaseDocumentation of reading rateCreation of a commissioning log | Duration: Additional work will be invoiced separately

Specification

Features

Product versionIdent commissioning
Product areaRFID
PrerequisitesFeasibility analysis, taking into account the specifications for the SICK productDefinition of the required functionsSICK product is mounted, electrically connected, and connected to the plantSICK product is configured with factory settingsSupply voltage and host connection are available at the installation siteSICK product and programming interface are easily accessible without toolsProvision of test objects and at least two reference transpondersAvailability of the plant for the duration of the service
Range of services, briefInspection of connection, alignment, optimization of parameters of the RFU/RFH as well as testsSetup of previously defined functions of reading configuration, data processing and network, interfaces and inputs and outputs
Range of servicesPreliminary analysis of possible influences of ambient conditionsInspection and possible correction of wiring and connection of the SICK productAlignment of the SICK productAdjustment of application-specific parameters; e.g., reading configuration, data processing, network/interfaces/inputs and outputsCreation of potentially necessary function blocksFiltering of overreaches with application-optimized settingsFunction and communication testIterative process within the estimated work time in order to optimize the reading rate for the applicationInspection of static or dynamic performanceTests on the sensor interface for the machine or plant with test objects and transponders provided by the customer – for comparison with the reference transponderBasic training for employees to explain how to operate the SICK product correctlyArchiving of product parameters in a SICK database
DocumentationArchiving of product parameters in a SICK databaseDocumentation of reading rateCreation of a commissioning log
DurationAdditional work will be invoiced separately
NoteInterventions in the software and controller of the overall system or the plant are not includedTransponder installation is not includedMechanical mounting of the SICK product must be carried out by the customer beforehand. The customer must provide qualified personnel to carry out any necessary changes to the mounting arrangements.Small parts are not included in the range of services
Machine life cycleInstallationCommissioning

Classifications

ECLASS 5.025219090
ECLASS 6.025219090
ECLASS 6.225219090
ECLASS 7.025219090
ECLASS 8.025219090
ECLASS 8.125219090
ECLASS 9.025219090
ECLASS 10.025219090
ECLASS 11.025219090
ECLASS 12.025219090
ETIM 5.0---
ETIM 6.0EC003015
ETIM 7.0EC003015
ETIM 8.0EC003015

Customer Reviews

0 reviews
0
0
0
0
0

There are no reviews yet.

Be the first to review “Sick Commissioning RFU/RFH”

Your email address will not be published. Required fields are marked *